WHAT do mean by M-309



WHAT do mean by M-309..

Answer / wer

^The process of selecting suitable ingredients of concrete and determining their relative amounts with the objective of producing a concrete of the required, strength, durability, and workability as economically as possible, is termed the concrete mix design. 




^Requirements of concrete mix design: 




The requirements which form the basis of selection and proportioning of mix ingredients are : 




a ) The minimum compressive strength required from structural consideration 




b) The adequate workability necessary for full compaction with the compacting equipment available. 




c) Maximum water-cement ratio and/or maximum cement content to give adequate durability for the particular site conditions 




d) Maximum cement content to avoid shrinkage cracking due to temperature cycle in mass concrete. 




^Standard mixes: 




The nominal mixes of fixed cement-aggregate ratio (by volume) vary widely in strength and may result in under- or over-rich mixes. For this reason, the minimum compressive strength has been included in many specifications. These mixes are termed standard mixes. 




IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. The mixes of grades M10, M15, M20 and M25 correspond approximately to the mix proportions (1:3:6), (1:2:4), (1:1.5:3) and (1:1:2) respectively. 

Is This Answer Correct ?    9 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

acceptance criteria for concrete works

0 Answers   L&T,


what is mean by bitumen emulsion

1 Answers  


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

0 Answers  


What are the common ways of demolition?

0 Answers  


1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm

1 Answers  






I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

0 Answers  


what is the difference between rcc pipe (pressure or non- pressure)and rcc hume pipe?

1 Answers  


8mm steel not available at site used bar 8mm and 150cc please tell me specing i used 10dia bar write formula please

4 Answers   Bestech,


what is the difference between compaction and consolidation??

7 Answers  


I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help

0 Answers  


how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar

0 Answers  


What is the unit weight of cement,sand,Brick,Reinforcement concrete

1 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)