Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate concrete pouring of foundation

Answers were Sorted based on User's Feedback



how to calculate concrete pouring of foundation..

Answer / sjtbehera

this is easy method . lenhth x breadth x height.

calculate it and amount is in cum.

Is This Answer Correct ?    1 Yes 0 No

how to calculate concrete pouring of foundation..

Answer / ashok kumar chaudhary

Dear Sir,

Calculate of Concrete Quantity of a Foundation

Length of Foundation = L (Mtrs)
Width of Foundation = B (Mtrs)
Height of Foundation = H (Mtrs)

So,

Volume of Foundation(Cubic Mtrs)=QuantityofConrete(Mtrs)

Length(Mtrs) X Width(Mtrs) X Height(Mtrs) = Volume(Mtrs)

L(M) x B(M) x H(M) = V(M3)

Conrete Quantity = V (M3)

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what are all the new civil construction materials?what are the new concepts ?

2 Answers   Essar,


why we are using 190x90x90 mm of brick size?

3 Answers   HCL, MPSC,


Give me the name of type of slabs?

1 Answers  


how many covering can be taken in the beam,column & slab also stair-case?

6 Answers  


cavitations is caused by

2 Answers  


qube strenth in 7nth days test

11 Answers   IVRCL,


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

0 Answers  


What is the main difference between crushing test and impact test in coarse aggregate?

2 Answers   Rites,


Diagonal check is required for a layout work to confirm ––

3 Answers  


To construct 100sq.yard what will be the cost in detail pls

2 Answers  


How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.

2 Answers   L&T,


Explain the difference between shear and tensile strength.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)