i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?

Answer Posted / venkatesh

Dia of cylinder =25 feet
Height of cylinder=7 feet
Area of cylinder = 3.142*25*25/4=490.93
Volume of cylinder=490.93*7=3436.25 cft=97.3 cum
say 97311.7 lts

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1415


how do you stabilize a waterlogged area in road construction

6314


Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

2042


1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?

6113


how to calculate the chair reinforcement length in slabs, footing or anywhere??

1886






Explain what is progress payment?

717


why the profile of shell of natural draught cooling tower is hyperabolic.

1616


Define a polyline?

687


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2033


Explain what is alternate bid?

795


How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097

1768


HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS

4227


What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?

1703


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1217


How to marking the building

1500