what is work of CTPT in 33/11kv Substation
Answer / rich sawe
CTPT - The Current Transformer and Potential Transformer,
these are instrument transformers used mainly for high voltage instrumentation purposes at the substation
1.Measurement purposes;these transformers provides low level signals to the metering equipments to measure line voltage level and line currents at the substation.
2.Protection purpose;these transformers provides signals to the upon occurrence of fault , over-current and under-current faults are firstly sensed by the current transformers then signals the O-C/U-C RELAY to trip the Circuit breaker ,Over-voltage and under-voltage faults is firstly sensed by Potential Transformer then signals the O-V/U-V RELAY to trip the Circuit breaker.
3. The occurrence of unbalanced fault condition in three phases at the substation is detected by the current transformers and potential transformers and the signal is fed to the respective relay to operate the circuit breaker.
4.on the POWER GRID the performance and operating status of the HIGH VOLTAGE SUBSTATION are monitored and controlled through feedback from CTPT
...DIT TANZANIA...
Is This Answer Correct ? | 7 Yes | 2 No |
How the real power output is controlled in a Generator?
direction of tarbine& genrator
different types of electrical cable?
Why no-load primary current is very small as compared to full load current in transformer (as 1% of full load current?
how to changeover ups in this power failur time?
how to erect roof control panel?
how to calculate magnetic force genrated by a coil ?
what is the reqirred voltage in HT motor to get full RPM on no load test?
what are the functions of power modulator?
AVR
what is the difference between MCB & MCCB
WHY THAT THREE COLORS CHOOSEN IN 3 PHASE? WHAT IS MEAN BY RYB?