Tell me important of the Production scheduling profile what are the things have to maintain in this profile

Answer Posted / dinesh kumar

PSP--- Production Schedulng Profile are set of controls asigned to a Material.

What are the controls

Order Release with the Creation of production order .

Scheduling with the Order Release

Auto Goods Receipt

Capacity Profile

Automatic Batch creation with the Production order for the header material

Order type for the system to select When we convert the PLanned order to Prd order.

These some of the generic controls associated with PSP.

Is This Answer Correct ?    12 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is processing class, where we do them and why?

697


Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?

699


Explain DMR.

1821


what are Standard keys

1725


What are traffic lights in mrp?

835






What is the role of an administrator in pa?

682


In implementation stage tell some standard scenario before AS-Is & TO-BE

1479


What is qualification deficiency?

847


We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

775


How the process time is calculated in a wc when both labour, machine categories exist?

703


What is golive actually? What is the role of a functional consultant in golive actually?

667


What are dynamic actions? Give a few examples. What are it’s you used in them?

654


Difference between PP and PI.

1724


What do you do to run MRP for just one MRP Controller?

1184


How do you get the system to update this value from the routing?

691