Tell me important of the Production scheduling profile what are the things have to maintain in this profile
Answer Posted / dinesh kumar
PSP--- Production Schedulng Profile are set of controls asigned to a Material.
What are the controls
Order Release with the Creation of production order .
Scheduling with the Order Release
Auto Goods Receipt
Capacity Profile
Automatic Batch creation with the Production order for the header material
Order type for the system to select When we convert the PLanned order to Prd order.
These some of the generic controls associated with PSP.
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is processing class, where we do them and why?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Explain DMR.
what are Standard keys
What are traffic lights in mrp?
What is the role of an administrator in pa?
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is qualification deficiency?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
How the process time is calculated in a wc when both labour, machine categories exist?
What is golive actually? What is the role of a functional consultant in golive actually?
What are dynamic actions? Give a few examples. What are it’s you used in them?
Difference between PP and PI.
What do you do to run MRP for just one MRP Controller?
How do you get the system to update this value from the routing?