How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Answer Posted / santosh singh
quantity of dry cement mortar per cum = 0.35 m3
half brickwork per 100 sqm = 0.315 m3
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
what are the types of design? which type of method is used at what type of design & why?
what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet
which steel is better for residential building tmt steel or hysd steel
What is the release of lien?
What are the phases inspections are done by local authority while construction?
Detection of a beam & a girder areββββ
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
what is conrete grade ,how are depent on concrete grad and size of concrete?
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
what is m30 in concrete tiles
How much time Required for PPR pipe network testing
If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
what is mean by c32/40s concrete class
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.