How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Answer Posted / shivaji yadav
1m3 concrete=400bricks with mortar
2.54cm mortar layed on all sides of brick
assume 400 bricks placed in asingle row
mortar vol= [(400-1)x10cmx10cmx2.54]+[19x400x10cmx2.54cm]
=294386cm3
=0.2943m3
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
how to take concrete quantity for precast segment for viaduct project?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
What is Time period of a building and its relation with frequency ?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
How to find permissible diagonal tensile stress in reinforced brick work
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
Which ratio use for cement selery???
All aptitude question of Bechtel
Process of pcc in wateredug
Which is the best book for building construction?