how to design a formwork for beam, how to determine the
load baring capacity of the cuplock system and which is the
relevant code for the same.
No Answer is Posted For this Question
Be the First to Post Answer
What should be the Min.Penetration in a hard rock for all pile diameteres?
What in bending moment, if a moment is free end of cantilever beam?
DESIGN PROCEDURES OF R.C.C ELEMENTS
Why reinforcement done in shorter span in two way slabs
0 Answers Osmani Constructions,
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
What is thumb rule in quality and quantity estimation of a Residential building??
0 Answers Ascent Constructions,
cross hairs in surveying telescope are fitted in the objective lense at the center of the telescope at the optical centre of eyepiece in front of the eyepiece
How many binding wire is use in arrangement of 25mt steel
Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?
I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?
is excessive curing for brick work is good or bad for the walls?
How can I make justification between using concrete grade c35 compare c37?