how to design a formwork for beam, how to determine the
load baring capacity of the cuplock system and which is the
relevant code for the same.
No Answer is Posted For this Question
Be the First to Post Answer
how many blocks required for 100sqft 8" blocks
What is the diffrence between FE 415 & FE 500 TMT BARS
Process of pcc in wateredug
1m3 3/4 inch course agreegate concrete is which m3 of agreegate ?
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300 sft in final coat with 12 mm. Any math involved? Plz help
31 Answers Asia Engineering, GMS, LTT,
What is the role of a PMC(project management consultancy) in any construction work?
concrete mix design for M 30 Grade
Define What are the uses of alloys in daily life and how are alloys made?
How many days should curing of plastering, brick work and concrete
how to find quantity of concrete in PCC M15
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)