what is the Purpose of Adding 20% of wet mortar & 1/3rd to
Dry Mortar for PCC & Plastering & Rcc .is there any
standard method for adding this .?
No Answer is Posted For this Question
Be the First to Post Answer
Explain what is the difference between built area and super built up area?
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
what is the diffreance between 1 way slab& 2way slab?
convert 1 kilo into brass
what would be compressive strength of cube for 7 days if design mix of M15
2. What are the advantages of your present job, things you like about it?
How to findout safe bearing capacity after stabilization of soil by method of the confinde method.
How many cement mortor dry quantity required for 1m3 ?(1:4)
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
what is the difference between GSB & WBM ?
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
How many types bend used in civil reinforcing
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)