how many materirials in 1 m3 concrete

Answers were Sorted based on User's Feedback



how many materirials in 1 m3 concrete..

Answer / master

04 materials

01.Cement
02.Fine aggregate
03.Coarse aggregate
04.Water

Is This Answer Correct ?    27 Yes 1 No

how many materirials in 1 m3 concrete..

Answer / balbhadrasinh

1 cement
2 sand
3 aggregate
4 water

Is This Answer Correct ?    8 Yes 1 No

how many materirials in 1 m3 concrete..

Answer / arvind rai

Actually, the concrete material depens on their ratio or proportion.without this we can not find out how many materials are required in 1cum concrete.
Hence ration is required.

Is This Answer Correct ?    5 Yes 0 No

how many materirials in 1 m3 concrete..

Answer / kapil

In Conventional Concrete

Cementitious + Fine aggregagte +Coarse aggregate + Water.

In Porous Concrete

Cementitious + Coarse Aggregate + Water

In grout mixes

Cementitious + Fine aggregate + Water

Is This Answer Correct ?    3 Yes 0 No

how many materirials in 1 m3 concrete..

Answer / b.sasidhar reddy

04 materials

01.Cement
02.Fine aggregate
03.Coarse aggregate
04.Water

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

any book or article on pumped concrete.

0 Answers  


why we providing 40mm cover to columns & 25mm to shear wall

1 Answers   NCC,


what is the procedure for flakiness and elongation index

1 Answers  


how you can say about a slab that it is one way or two way.

6 Answers  


state the difference between direct and indirect cold water supply scheme

1 Answers  






What is Aggrgate sizes used in a WMM Plant?

3 Answers   Black Stone,


what is the clear cover for shearwall?

0 Answers  


what is the requierd compressive strenth for m 20 grade concreat for 7 days?

10 Answers   Raj Construction,


which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)

43 Answers  


Can anyone tell me the salary and job profile of transportation engineers/transport engineer?

1 Answers  


A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?

5 Answers  


How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?

1 Answers   Suda,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)