how many materirials in 1 m3 concrete
Answers were Sorted based on User's Feedback
Answer / master
04 materials
01.Cement
02.Fine aggregate
03.Coarse aggregate
04.Water
Is This Answer Correct ? | 27 Yes | 1 No |
Actually, the concrete material depens on their ratio or proportion.without this we can not find out how many materials are required in 1cum concrete.
Hence ration is required.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / kapil
In Conventional Concrete
Cementitious + Fine aggregagte +Coarse aggregate + Water.
In Porous Concrete
Cementitious + Coarse Aggregate + Water
In grout mixes
Cementitious + Fine aggregate + Water
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / b.sasidhar reddy
04 materials
01.Cement
02.Fine aggregate
03.Coarse aggregate
04.Water
Is This Answer Correct ? | 2 Yes | 0 No |
any book or article on pumped concrete.
why we providing 40mm cover to columns & 25mm to shear wall
what is the procedure for flakiness and elongation index
how you can say about a slab that it is one way or two way.
state the difference between direct and indirect cold water supply scheme
What is Aggrgate sizes used in a WMM Plant?
what is the clear cover for shearwall?
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
which software better design in structure design or Rcc design(STAAD PRO,TEKLA STRUCTURE)
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
A bill was raised by contractor which read as follows 1.) Excavation in normal soil upto 1.5m - 250 cum 2.) Excavation in normal soil 1.5m to 3m - 240 cum 3.) Excavation in soft rock - 350 cum 4.) Excavation in hard rock - 250 cum 5.) Filling with available soil - 825 cum 6.) Filling with bought out soil - 1100 cum How can I verify the above quantities, especially for item no. 5 & 6? What checks are necessary before releasing the bill ?
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?