what is the differance beetwen installation and errection ?
Answer / vsrinivas
Installation
. Erect the m/c as per drawing with safety with
out damage of m/c.
Commissioning
. the same m/c handover to the costumer with
good working condition.
| Is This Answer Correct ? | 2 Yes | 0 No |
why star connected transformers used in tneb?
What is inductance?
What are the disadvantages of autotransformer?
how to select rating of HT Panel
How we can change the direction of rotation of Induction motor? Prove it using graphical methods.
Transformer/insulating oil tester(BDV tester)
what is dead tank CT AND what is live tank CT
Can we use droop CT in neutral in place of W phase of alternator ?
what is through fault?
How to calculate meter constant @ HT yard
what difference beetwin phase voltage & line voltage and phase current& line current ?
How does "OUT OF STEP" relay ,for Synchronous motor protection, work?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)