A 16 pile group, consisting of diameter concrete piles, were
cast in situ in a clayey soil whose unconfined compressive
strength is 1100 psf. Each pile is 60 ft long and the pile
spacing is 2.5 times the pile diameter.The water table is at
the ground surface and saturated unit weight of the clay is
118 lb/cu.ft. using a factor of safety 3 and a reduction
factor =0.45, compute the allowable capacity of the piles
acting as individuals


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

How steel required for 823 sqm of flooring work in 150mm c/c in single jali?

1 Answers  


what is the method of all soil testing in lab?

2 Answers  


How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?

1 Answers   L&T,


for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.

6 Answers   J.K. Organization, L&T,


I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item

0 Answers  






Which is the latest version of solidsworks?

0 Answers  


Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.

0 Answers  


1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?

1 Answers  


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

0 Answers   bscpl,


how to do connection between steel beam (I-Section) with R.C.C column??

2 Answers  


A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?

1 Answers  


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

0 Answers   Ace Info, Anil Group,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)