A 16 pile group, consisting of diameter concrete piles, were
cast in situ in a clayey soil whose unconfined compressive
strength is 1100 psf. Each pile is 60 ft long and the pile
spacing is 2.5 times the pile diameter.The water table is at
the ground surface and saturated unit weight of the clay is
118 lb/cu.ft. using a factor of safety 3 and a reduction
factor =0.45, compute the allowable capacity of the piles
acting as individuals
No Answer is Posted For this Question
Be the First to Post Answer
How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
what is the method of all soil testing in lab?
How to calcuate the quantity of cement,sand for plastering 1:4 12mm thick?
for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.
6 Answers J.K. Organization, L&T,
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
Which is the latest version of solidsworks?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.
1) what do you mean by rolling margin of steel ? 2)pls. tell the cut length formula of stirrups as per IS codes(take out cut length for a beam of 600*300mm with 40mm cover all sides)? 3)what is the multiplying factor of painting for sand faced plaster? 4)if your footing is of size1.9*1.6m . what quantity of length and width you will excavate means what extra margins you will allow as per IS codes in billing?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
how to do connection between steel beam (I-Section) with R.C.C column??
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
0 Answers Ace Info, Anil Group,