what is the strength [final]of grade m 15 to m 45

Answers were Sorted based on User's Feedback



what is the strength [final]of grade m 15 to m 45..

Answer / shaikh moyunuddin

concrete strength process timing is 1 year
after 28 days concrete gets 90% strength
then
for - M15=1:2:4=15+1.5=16.5 n/mm^2
for - M20=1:1.5:3=20+2=22 n/mm^2
for - M25=1:1:2=25+2.5=27.5 n/mm^2

& above the m25 grade,that is Based on design mix per IS.
for find strength of above m25 grade strength=concrete strength after 28 days+10%strength of concrete getting strength after 28 days


getting m45 grade strength laboratry test used
ther generally cement ratio increased & test & test till geting m45 strength

Is This Answer Correct ?    5 Yes 2 No

what is the strength [final]of grade m 15 to m 45..

Answer / goutam giri

It gains 100% strength after full curing (fully immersed in water)

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

in staad which are the point is to be checked for not fail of structure

1 Answers  


how much steel required for 1 square meter slab?

5 Answers   L&T, Lanco,


How do we determine the specific gravity of a cement?

0 Answers  


For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)

0 Answers  


What is steel reinforcement required for 1000 sqft house as per besic RCC frame structre ?

2 Answers  






While casting slab at what length slab casting should be stop

5 Answers  


how to stop beam concrete between column

0 Answers   L&T,


what is the weight of 12 mm 40 mm aggregate?

2 Answers   SCON,


how many digree of freedom in four bar chain

0 Answers  


Respected sir i am appearing for the exam this year.I will be highly obliged if u kindly send me last year's interview paper on civil engineering in my email address debosmitroy@yahoo.in

1 Answers  


How do we calculate the weight of aggregates, sand and cement M 25 design mixfor 1 cum

1 Answers  


how much time will take for G+22 building for completion? activity wise like excavation,sub structure,superstructure,finishing,handover?

2 Answers   Raheja,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)