mix design concrete m30 for elevated water tank
Answers were Sorted based on User's Feedback
Answer / ajay saini
for M-30 Mix design in zone 2 the w/c ratio is 0.45 so the consumption of cement is 425 kg/cum.water 169 kg,10mm 523 kg,20mm 784 kg, sand 541 kg, admixture 200 gm/bag
| Is This Answer Correct ? | 2 Yes | 1 No |
Deshuttering time for slab 6.15 meter
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
what is IS
12 Answers GMR, JMC, JMC Projects,
What things you need to take care of before building a kitchen island?
What you understand by building codes?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
where i can get material costs on weekly basis
what is project planning
Column is a compression member, concrete is strong in compression..then what is the reason to the column reinforcement..?
what in total station list counting
neutral axis more than the critical neutral axis then rainforcement in rcc beam belong to over or under rainforcement
How many modular bricks are required for 1 cubic meter of brick masonry?
14 Answers ITI, L&T,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)