Answer / deepak
steel percent,for Fe250-0.15% of Area of slab.
Fe415-0.12% of area of slab.
area of slab=392*450 m^2
=176400m^2
slab reinforcement=0.12%*179928=215.913 m2
| Is This Answer Correct ? | 6 Yes | 2 No |
Answer / sinjini choudhury
slab reinforcement=0.12%*total area
Area=392*459=179928cm2
slab reinforcement=0.12%*179928=215.913cm2
| Is This Answer Correct ? | 4 Yes | 1 No |
What are the types of concrete
why there is no concrete mix of ratio 1:.5:1
which percentage is maximum in good quality cement?
how to the steel dia without using d2/162
How much Strength of the cube can attain in 7days comparative 28 days strength?(as per IS code) ( specify the ref.clause also)
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
What are the different types of runners?
What is the PH value for domestic water supply
What is the purpose of Chipping in the heavy foundation?
what is the status of Brick & cube testing
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
what interested you in becoming a civil engineer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)