How to produce the Concrete Grade 30mpa at 12hour?
How to prevent for plastic shrinkage crack?
How can we produce fire resistant concrete?
No Answer is Posted For this Question
Be the First to Post Answer
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How to find the cement, sand, Aggregate, for m20, m25 grade of concrete..?
Distinguation between Developing Length and Lapping Lengh
What should be the Slump(Min.)in cement in concrete in all grades of concrete?
Describe a time when you anticipated potential problems and developed Preventive measures
0 Answers Graham Construction,
Does vetrified tiles needs to be cure before fixing?
what pressure the NP2 class RCC pipe can sustain?
Let suppose A building wall is 12 ft high and 30 ft long and labour cost is 100 rupee per feet so calculate the total cost of labour and also explain in detail...plz ans me immadiately i am hurry Thanx
How to calculate carrying capacity of the existing water supply trunkmain
How many types bend used in civil reinforcing
I Have concrete mix with 440kg opc and having 37 mpa strengh in 7days while in 28 days only 42mpa can anybody tell me the reason for the same.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)