mix design concrete m30 for elevated water tank
Answer Posted / ajay saini
for M-30 Mix design in zone 2 the w/c ratio is 0.45 so the consumption of cement is 425 kg/cum.water 169 kg,10mm 523 kg,20mm 784 kg, sand 541 kg, admixture 200 gm/bag
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
IS code for Rolling Margin of steel
How to identify the vitrified tile and ceramic tile by observation only after executing the job.
How to calculate Volume of Wet cement concrete for a specific grade?
How to fix toll charge for a particular vehicle at toll booths in a highway?
in 100 cft = 1350 bricks in 100 cft = ? bloks
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
Define What is the meaning of a blue land surveyors flag?
What is specific gravity???
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
how we check the thickness and line of ceiling plaster.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com