A PLC is programmed to drive three motors A, B and C as
follows :
After running motor A for an hour, motor B should get ON and
motor A should get OFF.
And after running motor B for an hour, motor C should get ON
and motor B should get OFF.
And after running motor C for an hour, motor A should get ON
and motor C should get OFF.
(That is, a cyclic repetition with time period one hour)
Now, the second condition is:
If any motor gone faulty and is tripped, the consecutive
motor should get ON and
the faulty (tripped) motor should be eliminated from cyclic
repetition.
The remaining two motors should bear the cyclic repetition
of one hour each.
(For healthy motor take logic as high and for tripped motor
take logic as low)
Now, the third condition is:
When motor A load(Amps) exceeds 60% of its rated load, motor
B should get ON in parallel to motor A.
And when both motors A & B are running in parallel, and if
their load exceeds 60% of their rated load,
motor C should also start in parallel to A & B.
[Here the cyclic repetition is eliminated, until their loads
become normal(40%)]
[Take logic high(1) for load at 60% and logic low(0) for
load at 40%]
Now draw a flow chart or a ladder diagram to fulfill the
above condition.
No Answer is Posted For this Question
Be the First to Post Answer
If boiler drum level transmitter is not working properly what you will do for resolving the problem in plant running condition?
define COMPENSATION??
What are securities of turbine?
what type problems create in radar level transmeter and what is its solution
can we replace a pressure transmitter of range 0 to 25 Kg/cm2 by a Pressure transmitter of range 0 to 10 Kg/cm2 ?.. Will it affect 4 to 20 mA output signal which we will feed to the PLC.
why the steam drum and deaerator level transmitter range is in negative MMWC to zero
3 Answers Emerson, Jindal, JKPM,
give me the formula for analog to digital converter and also d to a converter
hi vishok this is noor plz tell me what type problems will occured i use T/C in the place of RTD in (FEED WATER TANK),plz send ur e-mail address to my ID (mail2noor.hyd@gmail.com)
without a positionar can a control valve operate? give the difference of operating with positionar and without positionar?
what is difference between RTD , thermo couple and thermistor in general ?? (except temperature co-efficient )
what happens if we are having very very high cavity and flashing in a control valve..??? is it stops working...immediately... or eroded...slowly
what is procedure of calibration of remote seal transmiter, botom to top flanch 850mm, fluid liquid density .73, transmiter fixed on a fractionation colum, under vaccume 10mbar
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)