Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


rate
of
1cum
brick
masonry
please
immidate

Answers were Sorted based on User's Feedback



rate of 1cum brick masonry please immidate..

Answer / arun

this is no accurate answer of que.
but normally 550/cum.

Is This Answer Correct ?    4 Yes 0 No

rate of 1cum brick masonry please immidate..

Answer / naresh

rate of 1 cum brick masonary:-

Rs 320/ M3

Is This Answer Correct ?    0 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

I need to plaster an area of 1500 square meter. how much quantity of cement and sand need for this.?

5 Answers  


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

0 Answers  


Which stone is best for wall construction Laterite Stone or Cement Blocks

0 Answers  


What is unit weight of normal concrete?

0 Answers  


What are moment of inertia and its importance in civil engineering?

0 Answers  


where we use one way slab and two way slab?

7 Answers   SRM,


why we can use dust in concrete insted of fly ash

0 Answers  


What are the benefits of rcc pipes over steel designed pipes?

0 Answers  


How we calculate the cement for the M 15 normal concrete with aggregate size is 40 mm ?

5 Answers   Madhucon,


How to activate isometric axes in cad?

0 Answers  


why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?

2 Answers  


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)