you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answers were Sorted based on User's Feedback
Answer / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
Is This Answer Correct ? | 0 Yes | 1 No |
How to calculate paint drums per meter square
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Why did you choose to be an civil engineering
How to calculate strirubs hook length? one of my friend said unit of steel*dia of steel*no of bend=hook length is correct r wronge
is there any information regarding MPSC2010
why demand factor less then 1 ?
is basic cost of the material includes tax?
define curing? what is the necessity of curing?
calculation of cement bags in 1:2:4 concrete mix
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
What is design life of a bridge?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day