you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
How do you calculate load bearing capacity of a waffle slab?
Define What is aggregate?
Write short note on construction programme for pile foundation.
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
What is the difference between undo & redo?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
Formula of mid span bar
What are the techniques to measure road difference?
how to calculate the steel in 500yard
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
how to calculate weight of 1.8 cum of aggregate
What is the coeffiencent Friction Angle between Steel and Ashphalt?