you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
How to fix toll charge for a particular vehicle at toll booths in a highway?
what is features of a typ-ical modern air-conditioning installation?
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
how many shuttering material required for 1000 sq.m built up area.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What Are The Steps Involved In The Concreting Process, Explain?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
what does the grad of cement shows (denotes)?
in 100 cft = 1350 bricks in 100 cft = ? bloks
what is the use of water bar in water tank and is this an extra item in estimate?
what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??
what is moment-curvature relationship in semi rigid connections??
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?