you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is a projection line?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
Calculation of Pier Cap with tapper area?
What are the different types of runners?
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it
how to calculate the chair reinforcement length in slabs, footing or anywhere??
Explain major differences between routing maintenance and major maintenance.
What is Rankine Cycle?
roll of DLC in road constructions
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
Which IS Code/American Code applied for coupler test of steel