For a RCC section with congested reinforcement , what is the compaction factor
Answers were Sorted based on User's Feedback
Answer / krishu
.85 to .92 ... Bcz that's the range for rcc slump 50 - 100 mm
| Is This Answer Correct ? | 0 Yes | 0 No |
sir how can we find the cement and sand required for making 4" drop
how to calculate for ramp slop?
how to calculate cost for MS plate shuttering (show calculation/assumptions)
Dear Friends am S.PRABHU looking for job chnage i have wonderfull exposure to both Construction works & i have a experience 11 years if any found any suitable opening, please Contact 9986539249
if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building
0 Answers Ryna Facilities Services,
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how the sand fail?
Questions related to civil.engg in company
HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
0 Answers Civil Service, Intelinet, Marg, PMC,
Defination of civil engineering
what is the diffrence between grade beam and plinth beam
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)