Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


For a RCC section with congested reinforcement , what is the compaction factor

Answers were Sorted based on User's Feedback



For a RCC section with congested reinforcement , what is the compaction factor..

Answer / parul

google search.....
.95 to .96

Is This Answer Correct ?    17 Yes 2 No

For a RCC section with congested reinforcement , what is the compaction factor..

Answer / krishu

.85 to .92 ... Bcz that's the range for rcc slump 50 - 100 mm

Is This Answer Correct ?    0 Yes 0 No

For a RCC section with congested reinforcement , what is the compaction factor..

Answer / abid

We have to used 40mm Nedil

Is This Answer Correct ?    1 Yes 11 No

Post New Answer

More Civil Engineering Interview Questions

What is meaning of tlc

0 Answers   Backbone,


can any1 mail me IS CODES and quality check sheet of materials..? its urgent plz

3 Answers  


How much cement and sand required for 9"brick wall per square metre

0 Answers   Design Space, Rugipo,


What is the ring size of column 600x400 (8mm dia ring) ?

12 Answers   Simplex,


What is the different kinds of support?

3 Answers   Puravankara,


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

0 Answers  


What is meant by solid geometry?

0 Answers  


How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?

3 Answers  


How many cement mortor dry quantity required for 1m3 ?(1:4)

3 Answers  


Why we check specific gravity of admixture when we receive it? What is it's significance.

1 Answers  


Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––

0 Answers  


What is alternate bid?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)