you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / laxmi
50litres primer, 1 litres top coat
| Is This Answer Correct ? | 1 Yes | 8 No |
Post New Answer View All Answers
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How many kilo-newtons equals 1000 kilogram?
what are the Task work of different labour.?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Define What is the distance between railway tracks?
Formula of mid span bar
Define What is the tensile strength of wood?
how to calibrate the RM 800
How to find beam R/F cutting length
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
Formula for calculation volume of essentric footing
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
rimmer in pile foundation