Used Cement Mortar, Cement & Sand in 1 Square Meter or 1
Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
Answers were Sorted based on User's Feedback
Answer / uttam sasavade
If 1:4 Plaster Qty for 100 M2
= Wet Volume of Material 100 m2 x 0.018= 1.80 m3
= Dry Volume consider 25 % extra= 1.80 m3 x 1.25 = 2.25 m3
required.
1/5 =0.200 * 1.25= 0.25 / 0.0347bag= 7.204 bag req. for 1 m3
Cement required for 2.25 m3 x 7.204 bag= 16.209 bag.
Qty. required for 1 m2= 16.206 /100 = 0.16 bag
Sand 4/5= 0.8 * 1.25= 1 m3 x 2.25 m3 =2.25 m3 /100
sand Required for 1 m2 plaster 0.0225 M3
| Is This Answer Correct ? | 4 Yes | 2 No |
how to calculate length of bar
cement quantity in 1 M3 pcc
What are the advantages of cad software?
What is the weight of 10mm,20mm,40mm aggregate per cubic metre in kg?
8 Answers ABC Enterprise, Alstom, Badri Rai, IOCL, L&T, MICCO, NKC, PDC Construction,
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
What is the purpose of Chipping in the heavy foundation?
A person feels comfort when downs a stair because of ––
who much should be the lap length in reinfocement
what is the use in canals of longitudinal drains and cross drains in lining areas?
Machine mix is better than hand mixing to get––
What is the difference between Design and nominal mix?
how many days we should curing for plastering,brickwork,concrete?
10 Answers Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)