Used Cement Mortar, Cement & Sand in 1 Square Meter or 1
Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
Answers were Sorted based on User's Feedback
Answer / uttam sasavade
If 1:4 Plaster Qty for 100 M2
= Wet Volume of Material 100 m2 x 0.018= 1.80 m3
= Dry Volume consider 25 % extra= 1.80 m3 x 1.25 = 2.25 m3
required.
1/5 =0.200 * 1.25= 0.25 / 0.0347bag= 7.204 bag req. for 1 m3
Cement required for 2.25 m3 x 7.204 bag= 16.209 bag.
Qty. required for 1 m2= 16.206 /100 = 0.16 bag
Sand 4/5= 0.8 * 1.25= 1 m3 x 2.25 m3 =2.25 m3 /100
sand Required for 1 m2 plaster 0.0225 M3
Is This Answer Correct ? | 4 Yes | 2 No |
tmt steel
the capacity of water tank in liters if the diameter is 3m, and maximum height of water level as 1m.
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
What is the distance between railway tracks?
what is design life of steel structures??
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
rate of 1cum brick masonry please immidate
what is project planning
What is Well Point System in Dewatering
How much 1sqf area reinforcement formula
how many bricks are requir for one unit ho we will caculate
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever