24. Why should we hire you?
Answer / praveen yadav
For this question, your answer should list out strengths
that you feel are relevant to the job. Given below are some
answers which could help you with your answers. However,
structure them to suit your requirements.
I have good co-ordination skills
Good analytical skills
I can persuade people to see my point of view, and get the
work done
My greatest asset is my ability to motivate people
Even during emergencies, I do not loose my cool
I have good entrepreneurial skills
I have consistently met my deadlines and targets
Can say “no” to people when required to do so!
I am very co-operative with my sub-ordinates, and would like
to see them grow
I am a good team player
I am very flexible, and have the ability to work hard under
difficult work conditions
I have the experience and knowledge relevant to this job
(Here, give appropriate details and examples)
| Is This Answer Correct ? | 32 Yes | 1 No |
What are the common ways of demolition?
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
material requred for 1 square foot lanter with formula
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
What is the design mix? What is the proportion for M25, M35, M40 concrete mix.
9 Answers ACC, DBM, Era Infra Engineering, Thakural Constructions,
silt%= silt volume/ silt+sand volume is this right?
How do we say The LAP LENGHT is 50D to 60D ?????
What is the least count of Theodalite survey?
what is pile cap and why its used ??? why its provided in different shape
What are the disadvantages while using stone dust as filler in pavements?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)