what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answer Posted / sabari
The initial setting time of the cement should not be less
then 30mins,final setting time of the cement should not be
more than 10hrs
| Is This Answer Correct ? | 10 Yes | 2 No |
Post New Answer View All Answers
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is the substitute of Mastic Asphalt?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
Define What are the reasons for geotechnical site investigations in Uganda?
What is meant by solid geometry?
Why Should Curing Not Be Done By Ponding And Polythene Sheets?
What is critical path method (c.p.m)?
I need to constructive work in amaraj batteries
Which brick is best for construction ,either fly ash or AAC BLOCKS
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
how we calculate the grade of the Bituminous materials.?????