what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answer Posted / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
| Is This Answer Correct ? | 24 Yes | 3 No |
Post New Answer View All Answers
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
What is the different type of slump test indications?
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
who to find building iron rod strenth
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What is binding spacing of the rebars at lapping zones.
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
What is the formula for figuring out how many gallons of water are in a pipe by the foot?
How to increase a bearing capacity of soil?
Define What is diversion tunnel in a dam?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
what is relation between SPT N value and driving piles after conducting a soil test?