what is the initial setting time & maximum duration concrete
get hardening for ordinary portland cement?
Answer Posted / karthik rajendren
The initial seting time for OPC is 30 mins and max time 10
hrs to become hard.
| Is This Answer Correct ? | 24 Yes | 3 No |
Post New Answer View All Answers
How to activate isometric axes in cad?
What things architect have to take care of before starting any project?
what mean By core Billing
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
What is the difference between yeild strength and compressive strength of steel???
any book or article on pumped concrete.
What is binding spacing of the rebars at lapping zones.
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
115mm thickness brick work how to required mortar
What is the method of soil replacement test?
what is called the inverd level of mabhole chamber?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
How is the strength of cement measured?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?