When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.

Answers were Sorted based on User's Feedback



When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How ..

Answer / vikas d v

every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know

Is This Answer Correct ?    1 Yes 0 No

When you received a RA Bill of contractor at HO duly checked and certified by Site In-charge, How ..

Answer / sjtbehera

You have believe in your site engineer, go through dailr report or
MIS or by site visit.check list means if you do not go to site , you cannot check.

Is This Answer Correct ?    1 Yes 4 No

Post New Answer

More Civil Engineering Interview Questions

Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)

4 Answers   L&T, TATA,


What is minimum tensile strength required for structural steel works ?

2 Answers  


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

0 Answers  


How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft

0 Answers  


I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.

0 Answers   TVO,






what does the track parameter mean in staad.pro?

0 Answers  


which type of materials should be used for framed structure???

9 Answers  


While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?

2 Answers  


what are all the new civil construction materials?what are the new concepts ?

2 Answers   Essar,


plz anyone can tell me how to find the volume of dome whose radius is 3.25mt , height is 1.50mt and thickness is 0.15mt.

1 Answers  


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

0 Answers   XYZ,


Explain what is the release of lien?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)