how many brick sand cement require (1:5) 1 cum
Answers were Sorted based on User's Feedback
Answer / m.a. haleem akmal
473 Bricks, 0.232 cum Fine sand and 1.31 bags cement
| Is This Answer Correct ? | 10 Yes | 1 No |
Answer / jayanth
1/(.2*.1*.1)=500 Bricks
qty of cement=1*1.5*1444(density of cement)/6=361kg
sand=1805
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / ajayzarbade
total no of bricks=500 nos with inc. wastage
& 1cu.m bk.work 33% dry morter then ratio will be use 1:5 so
1/6=0.166m3/0.035
| Is This Answer Correct ? | 0 Yes | 0 No |
How to calculate material and labor required for 100 m2 plaster?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?
while doing floring in a room,from where one can start laying tiles.
what are the criterias for designing a school lab? for e.g a chem lab.Does it depend on room size or no. of students?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
what is concrete
Test procedure of fly ash bricks as per code ?
How you Confirm the Hard stratum for Driven cat in situ Pile work?
hi guys what happens if you are absent for a supplymentry exam?
How to calculate quantity of plum masonry in 1:3:7
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)