When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.

Answer Posted / sjtbehera

You have believe in your site engineer, go through dailr report or
MIS or by site visit.check list means if you do not go to site , you cannot check.

Is This Answer Correct ?    1 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where i can get material costs on weekly basis

1669


How you can use different dimension tools in cad? What are the different dimensions available?

686


What is the crank length in the slab?

636


Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.

671


why do we not deduct volume of steel to find actual volume of concrete in practical???

1329






how to estimate material requirement for an area of house in square feet?

1745


Why joints are provided?

687


how meny typs of renging rod?

1808


What is the meaning of a blue land surveyors flag?

786


What is the difference between absorption & adsorption and sorption?

755


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1441


Ratio for 4500 psi concrete

1182


residential buildings,mixing of concrete,structural,construction material,site handling.

2022


I am called for interview from north east power plant .so, I need some interview question which may help me.

1262


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3045