When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.
Answer Posted / sjtbehera
You have believe in your site engineer, go through dailr report or
MIS or by site visit.check list means if you do not go to site , you cannot check.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what are the ffactors you considered choosing the course?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
What is made from large rocks, which protects the base of cliffs?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
What is the difference between one-way slab and two-way slab?
Detection of a beam & a girder areββββ
Bernaullis theorem deals with the law of conservation of mass momentum energy none
what do you understand by M25 concrete
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
What is a kip?
The portion of a brick cut across the width is called?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour