When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.
Answer Posted / sjtbehera
You have believe in your site engineer, go through dailr report or
MIS or by site visit.check list means if you do not go to site , you cannot check.
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
what radial pressure, the NP2 class rcc pipe can sustain?
what is the difference between np2 and np3 concrete mix
What is the quantity of cement in mix m20 concrete?
How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.
yasser arfatcompleted his degree in civil from which university
why +1 to be followed for calculating the no of bars in BBS. Please explain
What are the different types of runners?
In cement concrete how to check a quality of material also proportion of material at site ?
what is the calculation of raw material for 0.35cum of m-15
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is parametre for M25 after 7 days strength
five requirements of infill panels for walls?
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
What is binding spacing of the rebars at lapping zones.
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure