How to calculate the amount of Brick,cement & sand required
for 1 cum of 115mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer / santosh
.240*.085*.10 = 0.00204 m3 with morter qty per brick
without morter qty of brick = .23*.075*.1 = 0.001725 m3
then 1/0.00204 = 490 bricks
= 490 * 0.001725 = 0.8456 only brick in m3
wet morter qty = 1- 0.8456 = 0.1544 m3
dry morter qty = 0.1544 * 1.32 = 0.204 m3
0.204/6*1cement = 0.03397m3 cement
cement = 0.03397 * cement density 1470/50kg per bags = 1 bags
sand 0.03397 * 6 =.204 m3 sand
sand in brass = 2.83 m3 = 1 brass 0.07208 brass
| Is This Answer Correct ? | 2 Yes | 1 No |
how we can say that concrete is a plastic concrete
Define What is made from large rocks, which protects the base of cliffs?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
How can I calculate the Compressive strength of cubes after 28 days of curing?Is there any formula or ration ?
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Concrete Mix designs for M15,M20,M25,M30 and M35
23 Answers Arelgee Consultants, ATCO, Fusion, Gammon, Power Cable, Raushan Engineers, Simplex,
Why we check specific gravity of admixture when we receive it? What is it's significance.
what is porosity??
what are the differences between Tie beam, Ground beam and strap beam. thanks
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
IS code for grade of concrete for bamboo lintel????
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)