Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate the amount of Brick,cement & sand required
for 1 cum of 115mm thick brick work with ratio 1:5 please
give me an answer with detailed step



How to calculate the amount of Brick,cement & sand required for 1 cum of 115mm thick brick work..

Answer / santosh

.240*.085*.10 = 0.00204 m3 with morter qty per brick
without morter qty of brick = .23*.075*.1 = 0.001725 m3
then 1/0.00204 = 490 bricks
= 490 * 0.001725 = 0.8456 only brick in m3
wet morter qty = 1- 0.8456 = 0.1544 m3
dry morter qty = 0.1544 * 1.32 = 0.204 m3
0.204/6*1cement = 0.03397m3 cement
cement = 0.03397 * cement density 1470/50kg per bags = 1 bags
sand 0.03397 * 6 =.204 m3 sand
sand in brass = 2.83 m3 = 1 brass 0.07208 brass

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

what is lap length?

8 Answers   CCCL,


what is mean by short coloumn? it is depend on the height? or dia of coloumn.?

8 Answers  


wat is diff. between rectangle & parallelogram?

4 Answers  


what are the criteria for choosing the span for the bridge (highway bridge)

4 Answers  


how to calculate Tile skirting

5 Answers   JMC Projects,


why we designed limit state method?

1 Answers  


Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938

2 Answers   ADP,


# 1. size of the Bricks # 2. Minimum Crushing Strength of Bricks

5 Answers   Brigade,


how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???

0 Answers   Student,


why we can use dust in concrete insted of fly ash

0 Answers  


What is specific gravity & how it is calculated

2 Answers  


What is the difference between nominal mix and design mix?

13 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)