When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.

Answer Posted / vikas d v

every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?

2135


how i convert mm into standard wire guage (SWG)no.

2604


how much required strength of cement concrete bricks(size 230x115x75mm)

1583


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1611


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

1223






For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1597


What is the largest concrete dam in the world?

692


please send me bhel questions on rupesh.017@rediffmail.com

2266


What is the general specifications of a bituminous pavement road?

1240


How many litres of water used for curing of 1000sqft of slav

1028


Specific gravity of cement?

1210


Time required for curing of wall tiles before fixing

1777


what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?

1564


What are the Types Of DPC and its Thickness used?

963


why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?

2757