When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.
Answer Posted / vikas d v
every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
how i convert mm into standard wire guage (SWG)no.
how much required strength of cement concrete bricks(size 230x115x75mm)
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
What is the largest concrete dam in the world?
please send me bhel questions on rupesh.017@rediffmail.com
What is the general specifications of a bituminous pavement road?
How many litres of water used for curing of 1000sqft of slav
Specific gravity of cement?
Time required for curing of wall tiles before fixing
what is zone a n zone b?why the spacing of ring in zone a less.n zone b high?
What are the Types Of DPC and its Thickness used?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?