When you received a RA Bill of contractor at HO duly checked
and certified by Site In-charge, How to know at a glance it is
complete in order, do have any one checklist format in this
regard.
Answer Posted / vikas d v
every Ra bill have previous and present amount to be paid if its typical floor or if u know the quantity of items u can easily know
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
(Project Management Topic) What are the important criteria in the successful realization of the project?
How do You Maintain a structure after getting cube test of low strength.
how calculate the bearing from two coordinates?
How is the strength of cement measured?
How will be cutting in timber plate size 600*400 column size
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Define block?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Form where IS456 is adopted in 1978?
what is the difference between np2 and np3 concrete mix
how much area can be platered by a mason for exterior
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
How to estabilish reinforcement Steel rolling margin for a building projects ?