Answer / sjtbehera
Approximate method to determine the qty of material of mortarfor 10cum brickwork- divide by 3 by the4 sum of numericalof the proportion of material which gives the qty. Of cement in cum. So 1:4=
3/1+4= .6 cum i.e 18 bags in 10 cum
Sand= .6 x 4 = 2.4 cum
It is ony applicable in 10 cum brickwork
You can try this method
| Is This Answer Correct ? | 0 Yes | 1 No |
Why should appointment store person for project ? what is the benefits for company ?
Water absorption for stone and first class stone bricks?
12. Have you ever been asked to leave a position?
what is the grade of 1:2:1 concrete mix
FOR SAME AMOUNT OF RAINFALL & EQUAL CATCHMENT AREA THEN WHERE RUN OFF WILL BE HIGHEST?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
I need model question papers for writing the Dubai municipality exam,for G+1
What is the substitute of Mastic Asphalt?
what is education Cess.
A lorry contains 3-Units of material(Sand/Metal/Gravel...) so 3-Units means how many (CFT and M3)
how to cement bag calculate m25 grade
how many cement and sand required for 1m2 plastering 1:4 cm
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)