how to cal 1:4 in brick masonary work cement and sand?
Answer / sjtbehera
Approximate method to determine the qty of material of mortarfor 10cum brickwork- divide by 3 by the4 sum of numericalof the proportion of material which gives the qty. Of cement in cum. So 1:4=
3/1+4= .6 cum i.e 18 bags in 10 cum
Sand= .6 x 4 = 2.4 cum
It is ony applicable in 10 cum brickwork
You can try this method
Is This Answer Correct ? | 0 Yes | 1 No |
How much stirrups spacing required for.column reinforcement?
3 Answers L&T, Ocean Interiors,
design data for small rc square water tanks
punj loyed and sapurjl palanjl
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What difference comes in constructing of house and a housing complex like society
How do you measure the centring work
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
what is stub column ?
how to nfind out the specific gravity of sand.aggregate,water please help...
What are the different grades of concrete & their ratios?
what is the use of bottom reinforcement in Cantilever Beam?