WHAT IS YOUR FUTURE PLANS FOR THE COMPANY IF PERMANENTLY
EMPLOYED
Answers were Sorted based on User's Feedback
Answer / md.nazimul islam bhuiyan
I'm trying my best to make it a Best Company all over the
world.
Is This Answer Correct ? | 12 Yes | 3 No |
Answer / s.manjula
I WILL TRY TO INTRODUSE NEW TECHNOLGY FOR DEVELBMENT OF OUR
COMPANY GROWTH.........
Is This Answer Correct ? | 5 Yes | 1 No |
Company will be in more better situation when I am hired
permanently. I will contributing more than enough in
improving the company and even my co-workers...
Is This Answer Correct ? | 3 Yes | 1 No |
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How to calculate the force on a column of three story building. What should be the base concrete height?.
What is difference between code and standard and specification?
what"s the responsibilities for QC(quality controler)in high rise buildings?
Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
how to calculate sand in CFT from a concrete foundation (m^3)???
how much grade of concrete can be used for different structural element such as slab,beam,column,footing & plinth beams? and type of cement can be used in construction work & also types of cemnt grades
What is tha cross secional area of cover block
Define Finite element method (FEM)
What is the tallest man made structure in the world?
what is the silt(for sand) allowed persentage as per IS CODE B/W: PLASTER: CONCRETE :
is plate load test can be done on cohesive soils for immediate settlements ?