what is project?
No Answer is Posted For this Question
Be the First to Post Answer
pls tell me about method of cutting length of ties column
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
for construction of 1 cum of brickwork what is requirement of cement, sand and bricks
3 Answers Nirman Consultants, Shapoorji Pallonji Group(SPCL),
specifications of fe500 steel
Differentiate first angle & third angle projection?
Describe the term BILL OF QUANTITY (BOQ)?
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
What will you do if you encounter problems like accidents?
Method for Calculating the WEIGHT OF ANGLE ?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)