what is the labour requirement for solid & hollow block work
Answer / ramen_pintu
For 1cum Solid Block Work 1masson & 3helper in 8Hrs
| Is This Answer Correct ? | 4 Yes | 1 No |
What is the diameter of the 3"inch nails?
while doing floring in a room,from where one can start laying tiles.
how many BSCs can i connect to the HUAWEI MSC
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
How to calculate chejja reinforcement
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
what is idealized curve for concrere and steel
What is the Steel bar spacing formula for Concrete Slab?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
explain fie benefits of using standard terminology in the measurement process
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
How can i display 5 asterisk and another 5 asterisk )?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)