what is the labour requirement for solid & hollow block work
Answer Posted / ramen_pintu
For 1cum Solid Block Work 1masson & 3helper in 8Hrs
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
plumbing CPVC fitting FTE Brass full form
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
detailed calculation of the amount of cement used?
Define What are the uses of alloys in daily life and how are alloys made?
what is the dimensions of river sand truck trailer or trolly ?
what is meant by shear center?????
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
what is smart building materials?
what is pouring and explain