what is the labour requirement for solid & hollow block work
Answer Posted / ramen_pintu
For 1cum Solid Block Work 1masson & 3helper in 8Hrs
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand
how to calculate the concrete mix m30 by volume
why demand factor less then 1 ?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What are the important hardware systems used for cad?
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
What is meaning of tlc
in one SQM plaster how much Cement and sand consumed in ratio 1:4
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
How to calculate the quantity of ingredients of M20 grade concrete?
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
what is civil engineer greatest strength and weakness?
to draw bm diagrams for portal frames under different loadings//
How to determine thee cut length for steel reinforcement bars in R.C.C design