what is the labour requirement for solid & hollow block work

Answer Posted / ramen_pintu

For 1cum Solid Block Work 1masson & 3helper in 8Hrs

Is This Answer Correct ?    4 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Hollow block masonry in cement mortar 1:4, 40×20×20cms in superstructure take 10sqm.I want calculation of brick sand

1260


how to calculate the concrete mix m30 by volume

1090


why demand factor less then 1 ?

1764


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

1604


What are the important hardware systems used for cad?

665






Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?

1579


What is meaning of tlc

1593


in one SQM plaster how much Cement and sand consumed in ratio 1:4

1663


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3033


How to calculate the quantity of ingredients of M20 grade concrete?

1519


Pls provide me with the calculation or codes related to de- shuttering of flat slabs

5906


when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?

1892


what is civil engineer greatest strength and weakness?

13364


to draw bm diagrams for portal frames under different loadings//

2436


How to determine thee cut length for steel reinforcement bars in R.C.C design

1054