what is constat for brickwork
No Answer is Posted For this Question
Be the First to Post Answer
how to calculate the cutting length of steel? by which formula?
3 Answers MS Khurana Engineering,
how to design a formwork for beam, how to determine the load baring capacity of the cuplock system and which is the relevant code for the same.
Is there any relation between grade of concrete and Steel
25. Are you willing to work overtime?
what is the productivity in aluminium shuttering per day
uses of M50 and M60 grade ordinary and pozzolona portland cement concrete?
what is the difference between linear and curved elements?
Used Cement Mortar, Cement & Sand in 1 Square Meter or 1 Square Feet For 10-18mm Thick Plaster ? (1:6) (1:4)(1:3)
What will you do if you encounter problems like accidents?
Formula of mid span bar
0 Answers Modern Construction Company, PFPL,
cement constant for brick works
As per thumb rule cement required per 1 cum of M20 concrete is 411Kg/cum(1.57/5.5=0.285cum of cement i.e 0.285*1440=411Kg).But as per PWD rate analysis cement required is 347Kg/cum.the difference is 64Kg.This kind of difference is coming every grade of concrete.Can you give perfect suggestion regarding this.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)