what is the allowable limit of wastage of cement for RMC at
plant operated manualy
Answer Posted / komalvgarg
In site-mixed concrete job, wastage occurs in handling of all materials, including cement. The latter is generally of the order of about 2-3 kg per 50 kg bag of cement. all such wastages are minimized to less than 1% in RMC facility.
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
Explain how you can turn off the display for dimension in CAD?
What is the per cu. mt. price of ready mix in Gujarat region.?
what is directivity effect?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
VAT and CST ? Which benefits for buyer ? Why benefits?
why is M30 grade Concrete use for Foothing & Column M50
how gradation of aggregates effect on slump of fresh concrete?
How to do base isolation for RC framed structure using ETABS software?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
Why do you want to work here
How long does it take concrete to harden?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
How do you change a dimension value in solidsworks?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How much does the leaning tower of pisa lean?