Answer / pavan
total quantity required would be 1.57 cum of dry mortar,
including 20% wastage.
Dry volume of mortar is 30% more than wet volume.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rehaan khan
For rcc work it will 1'57 cum
For brick masonary '30cum
For plaster work it will 1'60cum..
| Is This Answer Correct ? | 0 Yes | 0 No |
Why are steel plates inserted inside bearings in elastomeric bearings?
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
what is called fck
what is the standard brick frog size ?
Deshuttering time for slab 6.15 meter
Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk
how much overlap i must to provide in column 16mm dia bar and if i want to save steel by doing welding then how much over lap must be?
3 Answers Bin Hamda Trading Contracting,
What is the zero value in quantity surveying
What is the mix ratio by volume of concrete grade 45
How to calculate brick work quantity?? Block work quantity??
What is the weight of Plunger used in Vicat Apparatus used for testing of cement for knowing standard consistency.How many grams of cement is generally used for this test?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)