Suggest the best book for barc written test guide me the syllabus
Answer / praveen choudhary
BARC doesn't mention any question paper. So We advised you all candidates, please go through GATE syllabus.
| Is This Answer Correct ? | 6 Yes | 1 No |
HEAT TRANSFER - EXAMPLE 5.3 : In a cylinder with a hollow, let a is outside radius and b is the inside radius. In a steady state temperature distribution with no heat generation, the differential equation is (d / dr) (r dT / dr) = 0 where r is for radius and T is for temperature. (a) Integrate the heat equation above into T(r) in term of r. (b) At r = a, T = c; at r = b, T = d. Find the heat equation of T(r) in term of r, a, b, c, d.
NATURAL GAS ENGINEERING - QUESTION 26.2 : (a) The Hyperion sewage plant in Los Angeles burns 8 million cubic feet of natural gas per day to generate power in United States of America. If 1 metre = 3.28084 feet, then how many cubic metres of such gas is burnt per hour? (b) A reservoir of natural gas produces 50 mole % methane and 50 mole % ethane. At zero degree Celsius and one atmosphere, the density of methane gas is 0.716 g / L and the density of ethane gas is 1.3562 mg / (cubic cm). The molar mass of methane is 16.04 g / mol and molar mass of ethane is 30.07 g / mol. (i) Find the mass % of methane and ethane in the natural gas. (ii) Find the average density of the natural gas mixture in the reservoir at zero degree Celsius and one atmosphere, by assuming that the gases are ideal where final volume of the gas mixture is the sum of volume of the individual gases at constant temperature and pressure. (iii) Find the average density of the natural gas mixture in the reservoir at zero degree Celsius and one atmosphere, by assuming that the final mass of the gas mixture is the sum of mass of the individual gases. Assume the gases are ideal where mole % = volume % at constant pressure and temperature.
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.26 : In a construction accounting for a biochemical processing plant, $A has been spent to date, and another $B is expected required to complete the construction project. The biochemical processing plant is expected to generate a total revenue of $C. Calculate the : (a) estimated total costs; (b) percentage completion of project; (c) total estimated profit; (d) profit to date.
Tell us about a time when you failed to meet a deadline. What were the repercussions?
4 Answers Bhavani Engineering Works, Caltex, Emirates, Holiday Inn, Regent, United States Seafoods,
what is isochronus and droop speed?
print a pattern of abcdcba abc cba ab ba a a ab ba abc cba abcdcba
Explain what particle sizes are electrostatic precipitators used to remove?
what are your personal standards and how do you achive them?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.24 : (a) The net present value of an engineering project is given by V. Let Q = summation of [ T / (1 + I) ^ N ] from N = A to N = B, where P = project cost, T = tax inflow, N = duration. If V = P + Q where P = -$1000, T = $275, I = 0.12 (means 12 % , capital cost of project per year), A = 1 year, B = 5 years, calculate the value of V. (b) The present value tax shields are W = $ (11.9725, 9.1486, 6.5579, 4.1811, 2.0005) in 5 beginning balances of an engineering project. Find the adjusted present value of the engineering project X, when X = V + (summation of the values of W).
What is an additive?
What is critical radius of insulation?
Are there any alternatives to scraping a shell and tube if a capacity increase will make the pressure drop across the exchanger too large?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)