Question 83 - The United States of America Energy Information Administration reports the following emissions in million metric tons of carbon dioxide in the world for year 2012 : Natural gas : 6799, petroleum : 11695, coal : 13787. Coal-fired electric power generation emits around 2000 pounds of carbon dioxide for every megawatt hour generated, which is almost double the carbon dioxide released by a natural gas-fired electric plant per megawatt hour generated. If 1 metric ton = 1000 kg and 1 pound = 0.4536 kg, estimate the total energy generated by natural gas in the world for year 2012, in gigawatt hour.
ENGINEERING DRAWING - EXAMPLE 18.1 : For a Vernier scale of representative fraction (RF) = 1 / 25, calculate the length of the scale for the reading up to 4 metres.
What are the various utilities of the process plant?
Can any one send me the sample test papers of IOCL entry exam to be held on 6th july 2008. Also plz send the interview questions that cud probably be asked........i wud be highly obliged if u can send a few test paers and other stuff @ inderjeetd@gmail.com.........Inderpreet
How much experience you are having in commercial software for protein design?
Question 85 - (a) Three genes, I, J and K are available. All these genes are linked with respect to one another. If the percent recombination between I and J is 8 %, that between J and K is 10 %, and that between K and I is 18 %, what is the order of the gene? (b) Twenty six genes, a, b, c, d, e, f, ... x, y and z are available. All these genes are linked with respect to one another. If the percent recombination between a and b is 3 %, between b and c is 3 %, between c and d is 3 %, ... between w and x is 3 %, between x and y is 3 %, between y and z is 3 %, then what is the percentage recombination between b and y?
Question 81 - (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
which type of packing gives large interfacial area stacked or random?
ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.15 : Based on Time Discounting of Money, let y = x / (1 + r) ^ n, where ^ = power, r = interest rate for the period in decimal value, n = number of periods, y = current value, x = future value. According to Present Value Addition Rule, the present value of a set of future payments is equal to sum for present value of each of the payments. In an engineering business, 3 future payments are to be made : $100 after 1 year; $500 after 2 years; $200 after 3 years. (a) Form an equation of y as a function of r. (b) Find the value of y in 5 decimal places if r = 8 %.
What are some of the consequences of an undersized kettle type reboiler?
What are the reasons of removal of particles from effluent gas?
What is a black body?