L&T ACB C-POWER OF 800A FAULS TRIPING AT THE TIME OF 110KW
MOTOR STARTS WITH EARTH FAULT RELEASE
If it is new and under test ,CT might have been provided on
neutral instead of phase.If not , mostly due to pole
discrimination ( all poles not closing simultaneously ).
Disable instant element while closing .
| Is This Answer Correct ? | 0 Yes | 0 No |
What is an iron loss or core loss pi?
how to get more than 1000 ohms between 2 earth pits ?
We are installing a 1.6 MVA transformer at our crusher plant and the feeder of HPSEBL is 2 km away at substaion . and a VCB is installed in the substaion which is 2 km away from transformer so we need another VCB near the transformer.
what do you understand by dressing a HT/LT pole
1 Answers Federal Polytechnic Nekede,
How to calculate the Meter constant for the given Meter (by using any formula)
what is difference between co-generation and captive power plant?
What is FM200 Fire Supresion System??
what will happen when excitation of a synchronous machine is suddenly reduce to zero when it is running at full load..??
c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.
Tell me about Simence PLC 'BLOCK'.How many types and what for.
what is the principle of tubelight ??? what is the function of starter and choke ???
Why AC & DC capacitor are use in UPS ??????????????????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)