Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is pre-commissioning and commissioning ?



What is pre-commissioning and commissioning ?..

Answer / belmiro beve

Pre-Commissioning is the pre-check 0f Input/Output, motor
direction, etc.

Commission is divid in two type:
1. Cold run where we run the plant without product and;
2. The hot run where the plant is runned with product

Is This Answer Correct ?    18 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

What is stripper & spilitter ? Diffrence in this.?

0 Answers  


Controller not working in auto mode?...what are the problem can occur...Pls explain

1 Answers   Aramco,


Where is the flow transmitter installed with respect to control valve, state reason.

1 Answers   ADMA OPCO,


Can combine control system for Emergency control system (ESD)and Fire & Gas System ( F & G) is possble to built and offer to client? Can such system is as per Norms in India?

0 Answers  


how to change measuring units from mmwc to cubm/h in rosemount air flow transmitter with hart communicator fluke 744

0 Answers  


how to write the program for single push button by using ladder diagram

22 Answers   DigiTech,


Is it possible to convert 4 wire transmitter to convert to 2 wire with additional relay.Please send detial with drawing,i will appreciate.

2 Answers  


where we are used split range control

1 Answers   Borouge,


what is thermopile?

1 Answers   HNG,


What kind of feedback is used in DP cells.

1 Answers   CCIE,


if my 6 kva UPS gives 20 min. backup at 100 % load, then at 25% load what is the backup time?

17 Answers  


Calibration of flow transmitter.

1 Answers   CCIE, Power Plant,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)