Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


i am iti student i have project to do. that IS 100MW
220\33KV SUBSTATION I WANT TO KNOW HOW TO START, LIKE
CALCULATION, WHAT RATING OF CT,CVT, PT, ISOLATOR LIGHTING
ARRESTER WAVE TRAP CIRCUIT BREAKER IN 22OKV SIDE, ALSO TO
WARDS 33KV SIDE PLS HELP ME WITH THIS, THIS MY LIFE NOW, I
KNOW AUTOCAD, I LIKE TO KNOW HOW TO CALCULATE ALL THE THINGS

Answers were Sorted based on User's Feedback



i am iti student i have project to do. that IS 100MW 220\33KV SUBSTATION I WANT TO KNOW HOW TO S..

Answer / sakthivel

1,ct ration is depends on MF
2,what is meant by cvt
3,pt ration depends on MF
4,isolator depends on current rating
5,lighting arrester depends on MSL
6,wave trap depends on HZ
7,ct depend on current rating

Is This Answer Correct ?    2 Yes 1 No

i am iti student i have project to do. that IS 100MW 220\33KV SUBSTATION I WANT TO KNOW HOW TO S..

Answer / koti

1,ct ratig 350/1 & 2500/1 A (220 kv SIDE/ 33 KV Side)
2,cvt cvt FOR 66 + 160 kv
3,pt ratio 220/1.73 /33/173 kv
4,isolator 245 kv / 630A
5,lighting arrester 198 kv / 26 kv
6,wave trap depends on HZ
7,cB 220 kv / 1250 a AND 33 KV AT 5000 A

Is This Answer Correct ?    1 Yes 0 No

i am iti student i have project to do. that IS 100MW 220\33KV SUBSTATION I WANT TO KNOW HOW TO S..

Answer / surya

i need the calculation methods so i can do it for my self

pls help

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

if we want to increase the back up time of an UPS what should we do ? if we want to decrease the charging time of a battery/batteries attached with the UPS what should we do ?

6 Answers  


How to test and satisfy the conditions of the vector group YNd1 for power transformer?

1 Answers   Areva,


What is the size of a 60 watt and 80 watt tubelight?

0 Answers  


Why smallest capacity LV motor are star connected and medium & bigger size LV motors are delts connected

1 Answers  


what is the difference between ELCB and RCCB

5 Answers   Concorde, Hyundai,


What happened ,If 3 phase clearance not maintained in 33KV Line,11KV LIne etc?

0 Answers  


what is the range of using dol starter & star delta starter.

10 Answers  


What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?

0 Answers  


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

0 Answers  


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

0 Answers  


Why double earthing is required ?

1 Answers  


if a 3phase 100kva distribution transformer , 400 v,50 hz, 4-wire system is loaded at 160 k.w mostly 1-phase Lighting & Airconditioning split a.c load what will be the net effect on the power system in terms of voltage, powerfactor, current , efficiency of xformer

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)