Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.

Answers were Sorted based on User's Feedback



how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

DIRECT ESTIMATION METHOD : =

M20 (1:1.5:3) for 10 m^3

1. cement content = 15.2 \ (1+1.5+3)
= 2.763 cum
= 82 bags of 50 kg

2. water = 2.763 cum * 1.5
3. ca + fa = 2.763 * 3 cum

* here 15.2 is a standard value worked out from experiments.
so for 10 m^3 u can divide the sum of ratio by 15.2 to get
amount of cement directly...

* 50 kg of cement (1 bag) = (1/30) m^3 so = 0.034 cum
2.763cum / 0.034 cum = 82 bags

similarly u can work it out for

M25 1:1:2
m15 1:2:4
m10 1:3:6

Is This Answer Correct ?    19 Yes 8 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

according to the IS method of design mix
1. select the grade of concrete
2. select the target strength using the equation
f(target) = Fck (selected grade) + 1.65 * sd
3. a) using the table given in IS select the maximum cement
. content
b) selecct the nominal size of the aggregate
c) water cement ration
4. then procced as code says.. and u will get actual amount
of cement , fa ,ca ,water needed for 1 M^3

Is This Answer Correct ?    6 Yes 1 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / hitenpatel

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    8 Yes 3 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sridhar reddy

what piyash said is write but in place of water take fine aggreate

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / ansari asif ahemad

What Piyush said is right but in place of water take Sand. I think its typing mistake.

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / subbarao

by using constants of materials we have to find for 1cu.m and
then for 10cu.m

Is This Answer Correct ?    3 Yes 2 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sanket bagade

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Hai, I have applied for APPSC AEE (I&CAD) post.I need previous AEE papers of civil engineering.I hope u will kindly consider this and send.

1 Answers  


what is the difference between onw way slab & two way slab?

4 Answers  


Dfine superelevation.it depends upon which of the following. 1.surface condition of road 2.width of road 3.radius of curve 4.speed of vehicle

5 Answers  


What is the unit weight of cement?

1 Answers  


IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI

0 Answers  


how many litres of enamel paint required for 5000 sft of site?? 

0 Answers   Galfar,


How to calculate the crank length of the rod in beam? Please give me a details.

3 Answers   Agarwal Associates,


What is civgl engg?

1 Answers  


Why alternate bars are given bent-up in slab and how to decide the length of bent up?

5 Answers  


what is the real de-shuttering time for rcc column,slaband wall

3 Answers  


What is approximate % of wastage considered for Marble and vitrified tiling works (flooring)?

3 Answers  


how to preaper for interview wat they asked in interview give me idea

0 Answers   ONGC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)