how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

DIRECT ESTIMATION METHOD : =

M20 (1:1.5:3) for 10 m^3

1. cement content = 15.2 \ (1+1.5+3)
= 2.763 cum
= 82 bags of 50 kg

2. water = 2.763 cum * 1.5
3. ca + fa = 2.763 * 3 cum

* here 15.2 is a standard value worked out from experiments.
so for 10 m^3 u can divide the sum of ratio by 15.2 to get
amount of cement directly...

* 50 kg of cement (1 bag) = (1/30) m^3 so = 0.034 cum
2.763cum / 0.034 cum = 82 bags

similarly u can work it out for

M25 1:1:2
m15 1:2:4
m10 1:3:6

Is This Answer Correct ?    19 Yes 8 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / piyush singh

according to the IS method of design mix
1. select the grade of concrete
2. select the target strength using the equation
f(target) = Fck (selected grade) + 1.65 * sd
3. a) using the table given in IS select the maximum cement
. content
b) selecct the nominal size of the aggregate
c) water cement ration
4. then procced as code says.. and u will get actual amount
of cement , fa ,ca ,water needed for 1 M^3

Is This Answer Correct ?    6 Yes 1 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / hitenpatel

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    8 Yes 3 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sridhar reddy

what piyash said is write but in place of water take fine aggreate

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / ansari asif ahemad

What Piyush said is right but in place of water take Sand. I think its typing mistake.

Is This Answer Correct ?    3 Yes 0 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / subbarao

by using constants of materials we have to find for 1cu.m and
then for 10cu.m

Is This Answer Correct ?    3 Yes 2 No

how do we calculate the quantity cement,sand, & aggregate for M20,M15 for 10cum...

Answer / sanket bagade

a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

How we can calculate cement and sand for a wall 25ft x 28ft.Thickness of wall is 9inches.

0 Answers  


The ff slab casted its thickness 100mm.2nd floor slab will be casting its 300 mm.how we shall be given suppot to that 300mm thk slab.ple way me

3 Answers   Brigade,


Mention what are the composition of a landfill?

0 Answers  


How many are the types of joints?

0 Answers  


How do piles bear loads

3 Answers  






how to calculate load bearing column

0 Answers  


22. Are you willing to attend trainings, learn new skills and develop as a professional?

2 Answers  


how many cement and sand required for 1m2 plastering 1:4 cm

0 Answers  


how to calculate the cement, sand, coarse aggregate required for one cubic meter of concrete?

0 Answers  


How many kilo-newtons equals 1000 kilogram?

0 Answers  


different type of beam

6 Answers   L&T,


Under what circumstances should pot bearings be used instead of elastomeric bearings?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)