how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.

Answer Posted / subbarao

by using constants of materials we have to find for 1cu.m and
then for 10cu.m

Is This Answer Correct ?    3 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?

1299


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1383


how to check and keep control on the wastage of material at site

1861


How to calculate paint drums per meter square

2024


How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.

3709






In block work seawalls what is the purpose of slip joints?

764


Define What happens to Load at yielding ?

1335


what is relation between SPT N value and driving piles after conducting a soil test?

1588


what is differences between ferrock and concrete ?

1429


what is SDLC ?and write a 'c'program for to swapping the three numbers?

1401


Why should pumping be not used in case of concreting work?

896


IS code for Rolling Margin of steel

1916


What does civil engineering mean?

656


What is the worlds largest concrete dam?

717


Explain the difference between shear and tensile strength.

665