how do we calculate the quantity cement,sand, & aggregate
for M20,M15 for 10cum.
Answer Posted / hitenpatel
a) For 1 m3 of concrete Mix 1:2:4 (M15)
Add 50% for wet concrete = 1.50 m3
= 1.50/(1+2+4) = 0.214 m3
For 1 m3 = 30 bags of cement required (1440/50) say 30 bags
Cement = 0.214 x 30 = 6.42 bags
Sand = 0.214 x 2 = 0.428 m3
Aggregate = 0.214 x 4 = 0.856 m3
| Is This Answer Correct ? | 8 Yes | 3 No |
Post New Answer View All Answers
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
how lap length is increased with increase of Grade of steel?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
natucher of concrete &type of concrete?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How did the romans get water up hills using aqua ducts?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
How to determine thee cut length for steel reinforcement bars in R.C.C design
all technical question
which method is used in semi-rigid connection design??
What is semirigid connections?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
how many spacers we need for 1 ton reinforcement? aprox.
What is the force exerted by the tacoma narrows bridge?
what values & beliefs have guided you in your career path