qty of cement,sand and aggregate (1:3:6) required for RCC
Slab size 1000 x 500 x 100 mm
Answers were Sorted based on User's Feedback
Answer / ismail m ramsan
Sand: 0.24cm
Aggre: 0.471
Cement : 2.26 (50Kg) Bags
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / arif sherani
Cement 0.068cube
Send .0173cubi
Aggregate .03465cube
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajalaxmi singh
.10qntl cement,.02cum sand,.04cum aggregate.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / snehashish basu
Cement 11 Kg, Stone chips(6 to 20mm) 0.047 Cum, Sand 0.024
Cum.
| Is This Answer Correct ? | 8 Yes | 10 No |
cement 7.2kgs
sand 0.015cum
aggregate 0.03cum
qty of concrete 0.05cum
| Is This Answer Correct ? | 0 Yes | 2 No |
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
how much steel required for 1 sq.m area?
24 Answers AA Architects, L&T,
define prestressing? compare prestressing with post tensioning?
Sir how to find cutting length for footing steel bars in the shape of "u"
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
what"s the different between OPC (ordinary portland cement) and PPC (pozalana portland cement)?
3 Answers Ashok Leyland, Marathon Realty,
what is the wight of 4"/6" solid block?
what qualifications did you need to become a civil engineer?
what is the construction cost for per cft of multistorryed building in kolkata?
what are the types of bricks? & what is strength of this type?
How many no of bricks in 4.5 inch wall per m3 If brick size is 9"x4"x2 3/4"?? Please
2 Answers AR Rahman Foundation,
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)