for columns reinforcement the lap length is not provided then
how to rebar the rods then how rebar should be lapped
Answers were Sorted based on User's Feedback
Answer / n.rajesh guttedar
1) In the columns portion chip the old concrete in a small
depth at least we get the tie beam rods.Then make L bend of a
columns rods and weld it.
2) In the columns portion drill a holes to insert the new rods
and pour the bonding chemical ( Bonding agent )
3) In the columns portion fix the MS plate with the required
holes for the holefasners insert.And make the columns in U
type shape and weld it.
| Is This Answer Correct ? | 7 Yes | 1 No |
By welding the rod,and the welding should be in stagerred
type.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / suresh s
1st thing it should find that problem While Concrete Pouring Time immediately make The reinforcement at what length needed as per drawing.
2nd thing retrofitting method
3rd thing chip the column at lap height and tie the rod and weld it and pour the new concrete.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / sjtbehera
I think alternative step is welding and spiral binding
| Is This Answer Correct ? | 0 Yes | 2 No |
Please give me the mixing ratio for higher grades of concrete (M30, M35, M40, M45, M50) using cement, VSI sand (Maharashtra) and metal. In case any other additives are supposed to be added to my concrete please let me know about that as well.
pls give the grads of concrete and the ratios to the same
what is the procedure to clean the mivan technically?
Can we use Polystyrene as a Bitumen modifier !! if so is it a good MS research topic ? and what type of laboratory tests will be conducted during Research work ??
As an engineer, what u should do when the construction of a building doesn't meet the required specifications?
Determine the production capacity of a treatment plant for a city of 1,250,000 population. Assume the specific consumption per capita of 15ol/c/d, non-domestic water use of 30,000,000 m³/year, and UFW of 12%.
what is difference in chemical composition between fe415 and fe500
why is the column design?
what is the factor of safety for cement and steel with reference to IS 456-2000. and min reinforcement should be provided for column and slab with reference to IS 456-2000.
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
M20 Grade ratio? M30 Grade ratio? M40 Grade ratio ?
30 Answers AB Group, Aparna Enterprises, CECL, Engineers India, intex, Jain Group, Keystone, L&T, Multi Engineering, National, Shrinath Buildcon,
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)